All Terrain crane
150T

Liebherr LTM 1150-5.3

150 tonnes with a 66 metre telescopic boom

A 150 tonne all terrain crane carrying a 66 metre telescopic boom. A heavy class machine that still travels on five axles, so it reaches sites that would not take a six axle carrier.

Liebherr LTM 1150-5.3
At a glance

Key figures

150T
Maximum lifting capacity
66M
Main boom, telescopic
5
Axle carrier
Specification

Full specification

ClassAll Terrain crane
Maximum lifting capacity150 t at 3 m radius, 360 degrees on 45 t counterweight
Main boom12.3 m - 66 m, 1 base section and 6 telescopic sections
Swing-away jib10.8 m - 19 m at 0, 20 or 40 degrees
Counterweight29 t standard, 45 t maximum
Capacity at 20 m radius18.7 t on 45 t counterweight
EngineLiebherr 6 cylinder diesel, 400 kW
Carrier5 axles, all steered, 10 tyres 445/95 R 25
Availability24 hours a day, 365 days a year
Full specification sheetLiebherr LTM 1150-5.3 technical data and load charts (PDF) Download spec
Technical summaryTransport dimensions, outrigger footprint, tail swing and ballast, for planning the liftOpen

Manufacturer configuration figures. Exact capability for your lift - radius, height, ground bearing and counterweight - is confirmed against the load charts by our appointed persons.

Features

Built for the job

  • Telescopic boom of 1 base section and 6 telescopic sections, 12.3 m to 66 m
  • Telescopic boom extension of 7 m available
  • Double swing-away jib 10.8 m to 19 m, set at 0, 20 or 40 degrees
  • Counterweight 29 t as standard, 45 t with the additional 16 t fitted
  • Five axles, all steered, on ten 445/95 R 25 tyres
  • LICCON2 safe load indicator with test system and hoist limit switch
Working height, to scale
Main boom, telescoped66 m

Main boom length, to scale. Every lift is planned to the manufacturer load charts by our appointed persons.

Two ways to hire

Contract lift or hired & managed

One accountable partner
We take care of everything

Contract Lift

  • Full lift planning by our expert appointed persons
  • Crane, operator, supervision and slinger provided
  • Method statements and risk assessments included
  • Insurance for the lift carried by Bronzeshield
  • Ideal when you want one accountable partner
You manage the lift, we supply the muscle

Hired & Managed

  • The 150 tonner with our qualified operator
  • Working under your appointed person and lift plan
  • Flexible day-rate hire
  • 24 hours a day, 365 days a year availability
  • Ideal for experienced contractors with in-house planning
Good to know

Frequently asked

If you want one accountable partner to plan and carry the lift, choose a Contract Lift - we handle the lift plan, method statements, supervision and insurance. If you have your own appointed person and lift plan, take the crane Hired and Managed with our operator. Not sure? Our hire desk will point you the right way.

With 5 axles it needs suitable access and prepared ground for the outriggers and counterweight. We produce a swept-path analysis and a ground-bearing check as part of planning, and can advise on any enabling works before the crane arrives on site.

Yes. The Liebherr LTM 1150-5.3 is always supplied with one of our qualified CPCS operators, whether you hire it on a contract lift or hired and managed basis.

The heavy-lift cranes are in demand, so the earlier the better - but our hire desk is open 24/7 and we will always try to help at short notice. Call us to check availability for your dates.

Need the 150 tonner on your project?

Our hire desk is open 24 hours a day, 365 days a year. Tell us the load, the radius and the site - our planners will do the rest.

01322 555 050

hiredesk@bronzeshield.com